Reports until 16:03, Monday 11 July 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:03, Monday 11 July 2016 (28327)
Ops Day Shift Summary
Title:  07/11/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
State of H1: IFO unlocked. Switched intent bit form observing to commissioning. Guardian error – "4 dead channels" & EPICs comm error 
Commissioning: 
Outgoing Operator:  None
 
Activity Log: All Times in UTC (PT)

15:00 (08:00) Start of shift.
15:00 (08:00) Guardian error
15:30 (08:30) Richard – Reset End-Y Beckhoff IOC 
15:44 (08:44) Alfredo & Elizabeth – Going to the bridge over the X-Arm to put up a sign
16:25 (09:25) Sheila – Going into Optics Lab – Looking for BS optic
16:30 (09:30) Kyle – Going to Mid-Y to run test on rotating pumps
16:35 (09:35) Alfredo & Elizabeth – Back from X-Arm Bridge
16:53 (09:53) Sheila – Finished in Optics Lab – Going to Squeezer Bay
17:20 (10:20) Kyle – Back from Mid-Y
17:29 (10:29) Alfredo & Elizabeth – Going to the bridge over the X-Arm to work on new sign
17:44 (10:44) Alfredo & Elizabeth – Back from X-Arm 
18:06 (11:06) Sheila & Haocun – Going to ISC table at HAM2 – They will open the table.
19:28 (12:28) Sheila & Haocun – Out of the LVEA. 
19:46 (12:46) Kiwamu & Nutsinee – Transitioning LVEA to Laser Hazard
20:51 (13:51) Kiwamu – Going into LVEA to adjust ITM-X and ITM-Y IR cameras
21:13 (14:13) Dick – Going into LVEA to Squeezer bay to look for parts
21:21 (14:12) Kiwamu – Back into LVEA to work on camera alignment
21:27 (14:27) Richard – Bring a tour through control room
21:32 (14:32) Dick – Out of the LVEA
21:42 (14:42) Kiwamu – Out of LVEA
23:00 (16:00) Turn over to Ed 


End of Shift Summary:

Title: 07/11/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
Support: Jenne, Sheila, Kiwamu, Stefan, 
Incoming Operator: Ed

Shift Detail Summary: End-Y Beckhoff IOC crashed. It has been restarted. 
16:40 (09:40), IFO locked at INCREASE_POWER. IFO at 39.9W, Stefan is taking data.17:10 (10:10)
19:46 (12:46) LVEA transitioned to Laser Hazard. Will leave it Laser Hazard until Peter is finished with the hardware hunt tomorrow morning. 
IFO has been up and down all day, while commissioners are working through various issues, adjustments, and improvements.