Reports until 16:04, Tuesday 12 July 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:04, Tuesday 12 July 2016 (28355)
Ops Day Shift Summary
Title:  07/12/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
State of H1: IFO unlocked. Maintenance day 
Commissioning: 
Outgoing Operator:  None
 
Activity Log: All Times in UTC (PT)

13:00 (06:00) Peter – Looking for missing equipment in laser enclosures. 
13:15 (06:15) Peter – Transitioned LVEA to Laser safe
14:00 (07:00) Peter – Finished looking for equipment
15:00 (08:00) Start of shift
15:15 (08:15) Soda vendor on site for deliveries
15:36 (08:36) Ryan – Going into LVEA to recover computer equipment
15:55 (08:55) Joe – Going into LVEA to check eye wash stations
15:58 (08:58) Robert – Going into LVEA to work on PEM stuff
16:03 (09:03) Ryan – Out of the LVEA
16:04 (09:04) Paul – Going to End-Y to work on PEM stuff
16:09 (09:09) Narco - Deliver of N2 to CP2 (LX)
16:46 (09:46) Joe – Out of LVEA – Still has two forklifts on battery charger
16:50 (09:50) Cintas – On site to change out matts
16:55 (09:55) Kyle – RGA work at End-Y (WP #5992)
17:42 (10:41) Filiberto – Going into LVEA to check PSL and HAM6 racks  
17:52 (10:52) Joe – Going into LVEA to check on battery charging
17:53 (10:53) Paul – Back from End-Y
18:06 (11:06) Joe – Back from LVEA – Battery chargers are off
18:24 (11:24) Paul – Going to End-Y to check PEM stuff
18:25 (11:25) Jeff K. – Running charge measurements on ETM-X
18:29 (11:29) Filiberto – Back from LVEA
18:31 (11:31) Filiberto – Going to Mid-Y
18:45 (11:45) Hugh – Going to End-Y to center STSs
19:06 (12:06) Filiberto – Leaving Mid-Y
19:08 (12:08) Hugh – Back from End-Y
19:10 (12:10) Kyle – Back from End-Y
19:11 (12:11) Jeff K. – Running charge measurements on ETM-Y
19:25 (12:25) Jeff K. – Finished with charge measurements at End-X
19:30 (12:30) Kiwamu – Transition LVEA to Laser Hazard
19:40 (12:40) Narco – Delivery of N2 to CP5 (Mid-X)
19:50 (12:50) Kiwamu & Nutsinee – Working on HWS Table (WP# 5990)
20:01 (13:01) Dick – Going into LVEA to check electronics racks
20:10 (13:10) Dick – Out of LVEA
20:55 (13:55) Twin Cities Metals on site to make delivery for Bubba
23:00 (16:00) Turn over to Ed
 
End of Shift Summary:

Title: 07/12/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
Support: Sheila, Jenne, Jeff K., 
Incoming Operator: Ed

Shift Detail Summary: Maintenance day – All hands search of site for missing equipment. Equipment hunt has completed. 
Jeff K. ran charge measurements on ETM-X and ETM-Y.
Did initial alignment and locked the IFO to DC_READOUT
Commissioners requested high power – Lock broke just before reaching 40W. 
Relocking.