The missing equipment hunt concluded with limited success. There are still a few items missing. Fred, Vern, and Richard thanked all for the efforts. PSL – Looking into an instability with the FSS. CDS – Working on frame writer problem VAC – Will need to bake out the End-Y RGA before O2. All other subsystems report no problem. There will be no maintenance window on Thursday. There will be a safety meeting this afternoon at 15:00.