Displaying report 1-1 of 1.
Reports until 15:58, Wednesday 13 July 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 15:58, Wednesday 13 July 2016 (28392)
Ops Day Shift Summary
Title:  07/13/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
State of H1: IFO unlocked. Peter working on FSS instability. 
Commissioning: 
Outgoing Operator:  None
 
Activity Log: All Times in UTC (PT)

14:35 (07:35) Peter – In the LVEA working on the FSS
14:56 (07:56) Peter – Out of the LVEA 
15:00 (08:00) Start of shift
17:10 (10:10) Carlos – Rebooting Digital Video Server-1
17:30 (10:30) Peter – Alignment work on PMC (WP #5994)
18:45 (11:45) Hertz Equipment Rental on site to deliver snorkel lift to End-Y (WP #5995)
20:39 (13:39) Robert – Going to End-Y to setup magnetometer
21:10 (14:10) Kyle – Going to Mid-Y to overfill CP3
21:14 (14:14) Robert – Back from End-Y
22:18 (15:18) Kyle – Back from Mid-Y
23:00 (16:00) Hand off to Nutsinee
 

End of Shift Summary:

Title: 07/13/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
Support:  Peter, Cheryl, Stefan, Sheila, Keita, Kiwamu
Incoming Operator: Nutsinee 

Shift Detail Summary: Peter working on FSS instability. Working on relocking after FSS was stable. Locked at INCREASE_POWER, 39.5W. Hand off to commissioners.  


Displaying report 1-1 of 1.