Title: 07/13/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT) State of H1: IFO unlocked. Peter working on FSS instability. Commissioning: Outgoing Operator: None Activity Log: All Times in UTC (PT) 14:35 (07:35) Peter – In the LVEA working on the FSS 14:56 (07:56) Peter – Out of the LVEA 15:00 (08:00) Start of shift 17:10 (10:10) Carlos – Rebooting Digital Video Server-1 17:30 (10:30) Peter – Alignment work on PMC (WP #5994) 18:45 (11:45) Hertz Equipment Rental on site to deliver snorkel lift to End-Y (WP #5995) 20:39 (13:39) Robert – Going to End-Y to setup magnetometer 21:10 (14:10) Kyle – Going to Mid-Y to overfill CP3 21:14 (14:14) Robert – Back from End-Y 22:18 (15:18) Kyle – Back from Mid-Y 23:00 (16:00) Hand off to Nutsinee End of Shift Summary: Title: 07/13/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT) Support: Peter, Cheryl, Stefan, Sheila, Keita, Kiwamu Incoming Operator: Nutsinee Shift Detail Summary: Peter working on FSS instability. Working on relocking after FSS was stable. Locked at INCREASE_POWER, 39.5W. Hand off to commissioners.