Richard called saying the laser was off when he entered the Control Room this morning.
According to the laser status screen, the laser tripped due to a crystal chiller flow rate
error, somewhere in the power meter circuit. Attached are two plots of the previous one day's
trend data.
The signal from head 2 is somewhat noisier than the signals for the 3 other heads. Looking
back even further it seems to have been that way for at least the 6 days. Unfortunately we do
not have enough diagnostics to pinpoint the location of the potential blockage and at this point
in time it is a bit of a waiting game unless time is scheduled for invasive maintenance.
After restarting the laser at ~06:30, things seem to have settled down by 06:40.