Gerardo, Chandra GV 5 & 7 were soft closed at 9am local for Pcal camera mount installation on X/Y beam manifolds per WP 5988. GV5 opened at 45 psi; GV7 opened at 43 psi (11:30 am local) Attached are pressure trend data at gauges on each side of GVs. We did not pump out gate annuli because of short duration in isolation.