Last week, the HEPI actuators were driven after reattaching them to the boots. Few tests were performed:
- Linearity test (LHO_HPI_BSC8_Linearity_test_20120504T163242.fig)
- Range of motion (make sure there is 0.8mm amplitude)
- Transfer functions (10mHz-100mHz and 10Hz-500Hz) and comparisons with measurements before detaching the actuators (ISI unloaded for QUAD repairs). The comparison shows no/minor changes in the plant.
Note that the 100mHz and 10Hz points are linked.
https://svn.ligo.caltech.edu/svn/seismic/HEPI/H2/ITMY/Data/Figures/Transfer_Functions/Comparisons/L2L/