Reports until 23:57, Tuesday 19 July 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 23:57, Tuesday 19 July 2016 (28509)
Ops Evening Shift Summary
Title:  07/19/2016, Day Shift 23:00 – 07:00 (16:00 – 00:00) All times in UTC (PT)
State of H1: IFO unlocked. Site recovering from maintenance day.    
Commissioning: 
Outgoing Operator:  Ed 
 
Activity Log: All Times in UTC (PT)

23:00 (16:00) Start of shift
23:30 (16:30) Dave – Going into CER to reboot H1IOPSUSB123
23:34 (16:34) Dave – Finished in CER
23:36 (16:36) Dave – Going to both Mid Stations to reboot H1IOPPEMMY & H1IOPPEMMX
00:48 (17:48) Vern – Going into LVEA to restart TCS lasers
01:00 (18:00) Vern – Out of LVEA
01:23 (18:23) Peter – Going into LVEA to reset NPRO Noise heater
01:30 (18:30) Peter – Out of LVEA
03:24 (20:24) Nutsinee & Jeff K. – Going into LVEA to check TCS-Y Laser
03:46 (20:46) Nutsinee & Jeff K – Out of the LVEA
04:25 (21:25) Nutsinee – Going to TCS-Y table to power cycle laser
05:18 (22:18) Nutsinee – Going into LVEA to check cabling at TCS-Y Table
05:35 (22:35) Nutsinee – Out of LVEA


End of Shift Summary:

Title: 07/19/2016, Day Shift 23:00 – 07:00 (16:00 – 00:00) All times in UTC (PT)
Support: Dave, Jim, Hugh, Peter, Vern, Nutsinee, Jeff K., Jenne, Sheila         
Incoming Operator: N/A

Shift Detail Summary: Site is recovering from Timing system reprogramming (WP #5993). Jenne did initial alignment, and is now working on locking. Nutsinee & Jeff K. are sorting out a problem with the TCS-Y laser. They found the TCS-Y laser is down on power (putting out about 42W vs 58W for TCS-X). IFO locked and commissioning work continues.