TITLE: 07/21 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Jeff
SHIFT SUMMARY: It was one of those days for locking where everything seems to go wrong. I struggled with initial alignment most of the day, which was interrupted by various issues such as PSL crashing and FSS oscillating. ISIs were reset this morning, so the alignment of the arms was very bad and required a lot of work to recover.
LOG:
18:07 PSL trips off, called Peter
18:14 Peter toggling noise eater
22:12 Finally made it to DC_Readout
22:37 Nutsinee to LVEA racks
22:43 Nutsinee out
Dave restarting a bunch of models related to PI upgrades. Several other inconsequential (to locking) tasks which I didn't record due to being busy trying to lock.