Title: 07/22/2016, Day Shift 23:00 – 07:00 (16:00 – 00:00) All times in UTC (PT) State of H1: IFO locked at INCREASE_POWER, 19.9W. Wind is a Moderate Breeze to Near Gale (18 - 38mph), and gusty. Seismic is elevated, as expected, at the End Stations. Microseism is low but has been rising for the past hour. Locking during the day shift has not been difficult. Commissioning: Commissioners are commissioning. Outgoing Operator: Travis Activity Log: All Times in UTC (PT) 23:00 (16:00) Take over from Travis Title: 07/22/2016, Day Shift 23:00 – 07:00 (16:00 – 00:00) All times in UTC (PT) Support: Jenne, Incoming Operator: N/A Shift Detail Summary: IFO is locked at DC_READOUT. No commissioners on site. No planned commissioning work tonight. I have locked the doors and turned off the light.