kyle.ryan@LIGO.ORG - posted 16:22, Wednesday 27 July 2016 (28679)
Manually over-filled CP3
1605 - 1620 hrs. local -> To and from Y-mid
Opened exhaust check-valve bypass-valve, opened LLCV bypass-valve 1/2 turn -> LN2 at exhaust in 45 seconds -> Restored valves to as found configuration.
Next overfill to be Friday, July 29th.