Jenne, David M, Jim, Nutsinee, David B:
As part of the NGN signal problem investigation, at 13:46 PDT this afternoon we power cycled the IO Chassis for h1oaf0 (which runs the h1ngn model). Sequence was: stop models, power down h1oaf0, power cycle IO Chassis (powered down for at least 30 secs), powered up h1oaf0.
The TCS chillers did trip out soon after the power down, Nutsinee recovered them.