Reports until 17:59, Thursday 28 July 2016
H1 ISC
koji.arai@LIGO.ORG - posted 17:59, Thursday 28 July 2016 (28714)
3rd OMC inspection ~ epoxy delamination

[Betsy, Koji]

We brought the OMC to the bonding lab for inspection. We found some of the EP30-2 joints between the main glass breadboard and the invar mounting brackets showed sign of delamination. Dennis, Calum, and Garilyn have been notified and are woking on the counteraction.

Attachment 1: 40% delamination. This piece is holding one side of a balance mass holding bracket.

Attachment 2: 80% delamination. This piece is holding one side of a balance mass holding bracket.

Attachment 3: 40% delamination. This piece is holding one side of a balance mass holding bracket.

Attachment 4: 80% delamination and this piece is supporting one of the DCPD housing at the bottom side.

Attachment 5: 30% delamination and this piece is supporting the other DCPD housing at the bottom side.

Images attached to this report