We closed the shutter for two laser beam pipes between PSL and HAM1.
Lexan plates were installed on all HAM6 viewports. Yellow covers were installed on these viewports except one. For the remaining one, Gerardo will find and install one later).
Cable connections were documented and photographed, and all cables were disconnected from the table.
The accelerometer cable on HAM6 North door was disconnected fron the accelerometer and was taped on HAM5 North door. But the accelerometer itself is still on HAM6 North door.
ISCT6 was moved out of the way.
Cabling documentation of ISCT6.