Reports until 16:03, Monday 01 August 2016
H1 General
cheryl.vorvick@LIGO.ORG - posted 16:03, Monday 01 August 2016 - last comment - 16:06, Monday 01 August 2016(28787)
Ops Day Summary: HAM6 vent is tomorrow, other activities that require closed gate valves being planned

State of H1:  Lightpipe is closed and locked, rotations stage is disabled at 2W, venting HAM6 tomorrow

Activities:

15:00-16:00UTC: 

- morning meeting, alog 28769

- commissioning meeting

 

16:00-20:00UTC:

- JeffB - LVEA - dust count

- Fil/Alfredo/Elizabeth - HAM6/BSC3/BSC7 - pulling able to ITMX chamber for vacuum gauge

- tour in Control Room

- Hugh - helped with HAM6 SEI configuration, alogged here, alog 28773

- I took a snapshot of the last good alignment, alog 28779

 

20:00-22:00UTC:

- Chandra - MY - CP5 overfill

- Gerardo - EY - retrieved a yellow viewport cover

- Richard - disabled the rotation stage, alog 28786

- Richard - lightpipe locked, alog 28788

- Kyle - LVEA - measured dewpoint, alog 28782

- JimW/Micheal/Krishna: JimW + UW crew

    - bringing in a new seismometer 

    - will be careful to avoid adding contamination to the LVEA

    - will be taking it to the vertex - hand cary over or slide under the beamtube

- Fil/Alfredo/Elizabeth - HAM4, BSC3, BSC7 - pull new cable to vacuum gauge on BSC7

- Peter/Jason - PSL air conditioning has been changed, no entry into the PSL as of 22:00UTC

- Nutsinee - LVEA - TCS

- HAM6 ISCT6 moving crew - LVEA - moved the table away from HAM6 - Jenne, Keita, TJ, JeffB

- Gerardo - LVEA - HAM6 - covered a viewport with a yellow cover

- JeffB - LVEA * 4 - checking air quality / dust - other vent prep

- Robert/Richard/Fil - on the roof for anemometers

- Robert/Fil/Richard - back from the roof

- Jenne, TJ, Keita - out of the LVEA

- Chandra - back from MY

- Gerardo - back from EY

- Richard - back from LVEA

- Nutsinee - back from the LVEA

- Gerardo - back from HAM6

- JeffB - out of the LVEA

 

22:00-22:35UTC:

- JimW - out of the LVEA

- Fil/Alfredo/Elizabeth - out of the LVEA

 

22:35-23:00UTC

- Krishna/Micheal - out of the LVEA

- JeffB - LVEA - checking dust
- JeffB - out of the LVEA
 
LVEA is clear as of 23:02UTC
 

23:00UTC - end of OPS coverage today - no eve shift OPS this week due to HAM6 vent

 

Tomorrow - known activities:

- vent HAM6 and remove door(s)

- craning - Bubba

- seismometer setup - Micheal/Krishna

 
Comments related to this report
cheryl.vorvick@LIGO.ORG - 16:06, Monday 01 August 2016 (28791)

- Peter and Jason - out of the PSL