1605 hrs local -> Dew point measured at HAM6 check valve exhaust <-31C. 1630 hrs. local -> Kobelco running colder than normal (also noticeably quieter?) As found "LOADED" temps (manual coolant valve at the exit of the 2nd stage was 1/4 turn open) 1st STAGE DISCHARGE TEMPERATURE 276F 2ND AIR SUCTION 79F 2ND AIR DISCHARGE 257F LUBE OIL 91F 10 minutes after closing closing manual coolant valve 1/8 turn "LOADED" temps 1st STAGE DISCHARGE TEMPERATURE 288F 2ND AIR SUCTION 81F 2ND AIR DISCHARGE 280F LUBE OIL 108F Corner Station chilled water set point @ 44F (as per Bubba - normal is 48F) Compressor UNLOAD-LOAD cycle time = 1 minute 17 seconds Drying Tower switching cycle time = 4 minutes 56 seconds