[Betsy Koji Keita Corey Hugh]
For the OMC removal, we did the following actions along with the procedure E1600164
- Hugh removed the some of the table ballasts to have only the first layer
- Locked the top vertical blades.
- Locked the upeer mass with the screws
- Locked the upper mass vertical blades
- Removed a part of the black glass shroud
- Unhooked the suspension wires from the OMC breadboard
- Removed the breadboard from the OMC SUS frame