kyle.ryan@LIGO.ORG - posted 15:20, Sunday 07 August 2016 - last comment - 09:34, Monday 08 August 2016(28919)
1520 hrs. local -> Kyle.on site to check projects -> Will add comment to this entry when leaving


			
			
Comments related to this report
kyle.ryan@LIGO.ORG - 16:09, Sunday 07 August 2016 (28920)
VBOB bake good, 

Corner Station vent/purge air supply normal for current conditions of 38F chilled water supply and 1/8th turn closed (from nominal 1/4 turn open) manual coolant valve (1 of 2 - not the after cooler valve),  

1st STAGE AIR DISCHARGE 296F 
2ND STAGE AIR SUCTION    82F 
2ND STAGE AIR DISCHARGE 280F 
LUBE OIL                126F

Did not measure dew point at HAM6 but observed drying tower switching.  No alarms.  

Y-end RGA bake good > 160C everywhere on RGA side and tapering off to 70C @ the turbo inlet and the 4.5"-10" CFF BSC6 interface, 

1610 hrs. local -> Leaving site now.
chandra.romel@LIGO.ORG - 09:34, Monday 08 August 2016 (28926)
Thanks for checking on the purge air, Kyle.