Title: 08/08/2016, Day Shift 15:00 – 23:00 (08:00 –16:00) All times in UTC (PT) State of H1: IFO is unlocked. HAM6 Vent Commissioning: Commissioners are commissioning as HAM6/IFO condition allow. Outgoing Operator: N/A Activity Log: All Times in UTC (PT) 13:55 (06:55) Chris S – Going to End-X to check wind fence 14:30 (07:30) Chris S – Back from End-X 15:00 (08:00) Start of shift 16:08 (09:08) Filiberto & Ed – In LVEA to prep for power and cabling work at HAM4 16:15 (09:15) Enable the Rotational Stage for Koji – Needed 10W of laser power for alignment 16:32 (09:32) Koji & TJ – Going to HAM6 16:36 (09:36) Betsy & Calum – Going to HAM6 16:38 (09:38) Hugh – Going to End-Y 16:40 (09:40) Filiberto & Ed – Out of LVEA 16:41 (09:41) Kyle – Going to End-Y 16:55 (09:55) Richard – Going to HAM6 17:01 (10:01) Hugh – Back from End-Y 17:08 (10:08) Richard – Out of LVEA 17:11 (10:11) Gerardo – Staging for Ion Pump work at GV3 17:16 (10:16) Jonathan – Going to H2 Enclosure to reboot computer on test stand 17:22 (10:22) Chandra & Gerardo – Going to GV3 to change Ion Pump (WP #6064) 17:28 (10:28) Kyle – Back from back from End-Y 17:20 (10:20) Jonathan – Out of H2 Enclosure 17:45 (10:45) Chandra & Gerardo – Out of LVEA 18:14 (11:14) Jim W & Ian – Going into LVEA to look at HAM6 18:16 (11:16) Kyle – Going into LVEA to look for controllers 18:50 (11:50) Richard – Going to HAM6 19:00 (12:00) Filiberto – Shutter controller work at HAM6 (WP #6065) 19:02 (12:02) Richard – Out of LVEA 19:07 (12:07) Koji, TJ, & Betsy – Out of the LVEA 19:31 (12:31) Krishna – Going into the LVEA (Biergarten) to work on BRS 20:07 (13:07) Chris – Going to Mid-X Fan room to change filters 20:08 (13:08) Richard – Going to HAM6 20:15 (13:15) Richard – Out of the LVEA 20:15 (13:15) Koji, TJ, Betsy – Going to HAM6 20:18 (13:18) Gerardo – Going into LVEA to move AUX cart 20:20 (13:20) Chandra – Going into LVEA to the measure piping for annulus pump 20:38 (13:38) Richard & Filiberto – Out of the LVEA 20:53 (13:53) Chris – Leaving Mid-X – Going to Mid-Y 21:02 (14:04) Kyle – Going to the Vertex RGA 21:07 (14:07) Filiberto – Going into LVEA for shutter controller work (WP #6065) 21:14 (14:14) Richard – Going into LVEA 21: 25 (14:25) Richard – Out of LVEA 21:26 (14:26) Gerardo – Out of LVEA 21:33 (14:33) Richard – Going into the CER 21:37 (14:37) Richard – Out of the CER 21:45 (14:45) Chris – Back from Mid-Y 22:04 (15:04) Chandra – Going to Mid-Y to fill CP3 22:14 (15:14) Ed – Going to Mid-X to look for a power supply 22:36 (15:36) Ed – Finished at Mid-X – Coming back to CS 22:56 (15:56) Chandra – Going into the LVEA to make measurements 22:57 (15:57) Krishna – Out of the LVEA Title: 08/08/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT) Support: Cheryl Incoming Operator: N/A Shift Detail Summary: IFO is unlocked due to HAM6 vent for OMC repairs. Koji requested 10W of PSL power. Unlocked and re-enabled the Rotational Stage. Cheryl checked and aligned IMs. OMC alignment and HAM6 closeout work continues.