Reports until 16:01, Monday 08 August 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:01, Monday 08 August 2016 (28937)
Ops Day Shift Summary
Title:  08/08/2016, Day Shift 15:00 – 23:00 (08:00 –16:00) All times in UTC (PT)
State of H1: IFO is unlocked. HAM6 Vent
Commissioning: Commissioners are commissioning as HAM6/IFO condition allow.
Outgoing Operator:  N/A
 
Activity Log: All Times in UTC (PT)

13:55 (06:55) Chris S – Going to End-X to check wind fence
14:30 (07:30) Chris S – Back from End-X 
15:00 (08:00) Start of shift
16:08 (09:08) Filiberto & Ed – In LVEA to prep for power and cabling work at HAM4
16:15 (09:15) Enable the Rotational Stage for Koji – Needed 10W of laser power for alignment
16:32 (09:32) Koji & TJ – Going to HAM6
16:36 (09:36) Betsy & Calum – Going to HAM6
16:38 (09:38) Hugh – Going to End-Y
16:40 (09:40) Filiberto & Ed – Out of LVEA
16:41 (09:41) Kyle – Going to End-Y
16:55 (09:55) Richard – Going to HAM6
17:01 (10:01) Hugh – Back from End-Y
17:08 (10:08) Richard – Out of LVEA
17:11 (10:11) Gerardo – Staging for Ion Pump work at GV3
17:16 (10:16) Jonathan – Going to H2 Enclosure to reboot computer on test stand
17:22 (10:22) Chandra & Gerardo – Going to GV3 to change Ion Pump (WP #6064)
17:28 (10:28) Kyle – Back from back from End-Y
17:20 (10:20) Jonathan – Out of H2 Enclosure
17:45 (10:45) Chandra & Gerardo – Out of LVEA 
18:14 (11:14) Jim W & Ian – Going into LVEA to look at HAM6 
18:16 (11:16) Kyle – Going into LVEA to look for controllers
18:50 (11:50) Richard – Going to HAM6
19:00 (12:00) Filiberto – Shutter controller work at HAM6 (WP #6065)
19:02 (12:02) Richard – Out of LVEA
19:07 (12:07) Koji, TJ, & Betsy – Out of the LVEA
19:31 (12:31) Krishna – Going into the LVEA (Biergarten) to work on BRS
20:07 (13:07) Chris – Going to Mid-X Fan room to change filters
20:08 (13:08) Richard – Going to HAM6
20:15 (13:15) Richard – Out of the LVEA
20:15 (13:15) Koji, TJ, Betsy – Going to HAM6
20:18 (13:18) Gerardo – Going into LVEA to move AUX cart
20:20 (13:20) Chandra – Going into LVEA to the measure piping for annulus pump
20:38 (13:38) Richard & Filiberto – Out of the LVEA
20:53 (13:53) Chris – Leaving Mid-X – Going to Mid-Y
21:02 (14:04) Kyle – Going to the Vertex RGA
21:07 (14:07) Filiberto – Going into LVEA for shutter controller work (WP #6065)
21:14 (14:14) Richard – Going into LVEA 
21: 25 (14:25) Richard – Out of LVEA
21:26 (14:26) Gerardo – Out of LVEA
21:33 (14:33) Richard – Going into the CER 
21:37 (14:37) Richard – Out of the CER
21:45 (14:45) Chris – Back from Mid-Y
22:04 (15:04) Chandra – Going to Mid-Y to fill CP3 
22:14 (15:14) Ed – Going to Mid-X to look for a power supply
22:36 (15:36) Ed – Finished at Mid-X – Coming back to CS
22:56 (15:56) Chandra – Going into the LVEA to make measurements
22:57 (15:57) Krishna – Out of the LVEA
 

Title: 08/08/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
Support:  Cheryl
Incoming Operator: N/A

Shift Detail Summary: IFO is unlocked due to HAM6 vent for OMC repairs. Koji requested 10W of PSL power. Unlocked and re-enabled the Rotational Stage. Cheryl checked and aligned IMs. OMC alignment and HAM6 closeout work continues.   