Reports until 11:16, Thursday 11 August 2016
H1 PSL
jason.oberling@LIGO.ORG - posted 11:16, Thursday 11 August 2016 (29021)
PSL found off this morning, now running

J. Oberling, J. Bartlett, P. King (from Pasadena)

Jeff came in this morning and found the PSL to be off.  Trends indicated the laser turned off at around 3:25 am PDT, with errors showing the flow was zero and the NPRO was turned off (no power watchdogs were tripped); the crystal chiller was found to be off, while the diode chiller was still running.  The crystal chiller was restarted and allowed to run for ~15 minutes and no glitches or errors were seen (last time we had a flow problem the chiller would glitch when just running by itself, no laser).

In discussion with Peter he suggested the possibility of the NPRO tripping (likely due to a power glitch or a glitch from the UPS).  When this happens the NPRO power supply, located in the PSL rack in the LVEA, needs to be manually re-enabled.  Upon inspection, the NPRO power supply indeed had to be manually re-enabled, which points to either a power glitch or a glitch of the UPS the NPRO is plugged into.  We don't think it's a power glitch as that would cause issues with other IFO systems, and this was not seen.  This leaves the most likely culprit at this time as a glitch from the NPRO UPS.

The laser is now back up and running, all stabilization systems enabled.  I took this opportunity to reset the HPO LRA back to its reference position and reset the relock counter for the injection locking system.