Title: 08/11/2016, Day Shift 15:00 – 23:00 (08:00 –16:00) All times in UTC (PT) State of H1: IFO is unlocked. HAM6 Vent work is complete. Pump down is well underway. PSL tripped off. Commissioning: Recovering IFO Outgoing Operator: N/A Activity Log: All Times in UTC (PT) 14:45 (07:45) Chandra – Going to leak check new gauge on HAM6 15:00 (08:00) Start of shift 15:00 (08:00) PSL is down. Notified PSL team 15:13 (08:13) John – Going into LVEA 15:13 (08:13) Gerardo – Going into LVEA 15:45 (08:45) Vacuum crew out of LVEA 16:18 (09:18) Koji, Kiwamu, Stefan – Going into LVEA to connect ISCT6 table 16:25 (09:25) Krishna – Going to Biergarten to work on compact BRS 16:35 (09:35) Filiberto – Going to HAM6 to connect ISCT6 table 16:46 (09:46) Kyle – Going to End-Y to scan RGA 16:50 (09:50) Chandra – Opened CB to shutdown HAM5/6 cleanroom. All cleanrooms ore off. 16:54 (09:54) Koji, Kiwamu, Stefan – Finished connecting ISCT6 table 17:00 (10:00) Kiwamu – Transitioning LVEA to Laser Hazard 17:15 (10:15) Ed – Going to End-X to install cabling for wind sensor 17:26 (10:26) Kyle – Back from End-Y 17:46 (10:46) Apollo Mechanical on site to meet Bubba 17:47 (10:47) Filiberto – Finished with ISCT6 - Out of the LVEA 17:50 (10:50) Vern – In the LVEA to turn on TCS Lasers 17:54 (10:54) Jason – Recovered Laser – Going into LVEA to check PSL UPS 18:15 (11:15) Vern – Power cycle PSL Rotation Stage EtherCAT chassis 18:30 (11:30) Kiwamu & Koji – Alignment work on ISCT6 18:30 (11:30) Hugh – Going to HAM6 to unlock HEPI 18:47 (11:47) Ed – Back from End-X 19:05 (12:05) Hugh – Out of LVEA – HEPI is unlocked 19:30 (12:30) Koji & Kiwamu – Out of the LVEA 19:32 (12:32) Richard – Going to check TCS interlock 20:06 (13:06) TJ – Going into LVEA to recycle TCS laser interlock 20:35 (13:35) Vern & Richard – Going into LVEA to check TCS lasers 20:36 (13:36) Chandra & Calum – Going to Both end stations 20:37 (13:37) Kyle – Going to End-Y 20:45 (13:45) Vern & Richard – Out of the LVEA 20:55 (13:55) Kiwamu & Koji – At ISCT6 for alignment work 21:17 (14:17) Cheryl – Going to ISCT6 21:25 (14:25) Cheryl – Out of the LVEA 21:33 (14:33) Kiwamu & Koji – Finished with ISCT6 alignment 21:41 (14:41) Chandra & Calum – Back from end stations – Going into LVEA Title: 08/11/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT) Support: Incoming Operator: N/A Shift Detail Summary: IFO is unlocked. PSL down. Jason working on bringing the lase back up. Cleanup and close out work has finished at HAM6. Vacuum crew has reopened GV5 & GV7. LVEA transitioned to Laser Hazard. Laser are back up. Commissioners recovering IFO.