Reports until 16:15, Thursday 11 August 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:15, Thursday 11 August 2016 (29031)
Ops Day Shift Summary
Title:  08/11/2016, Day Shift 15:00 – 23:00 (08:00 –16:00) All times in UTC (PT)
State of H1: IFO is unlocked. HAM6 Vent work is complete. Pump down is well underway. PSL tripped off. 
Commissioning: Recovering IFO
Outgoing Operator:  N/A
 
Activity Log: All Times in UTC (PT)

14:45 (07:45) Chandra – Going to leak check new gauge on HAM6 
15:00 (08:00) Start of shift
15:00 (08:00) PSL is down. Notified PSL team
15:13 (08:13) John – Going into LVEA
15:13 (08:13) Gerardo – Going into LVEA
15:45 (08:45) Vacuum crew out of LVEA
16:18 (09:18) Koji, Kiwamu, Stefan – Going into LVEA to connect ISCT6 table
16:25 (09:25) Krishna – Going to Biergarten to work on compact BRS
16:35 (09:35) Filiberto – Going to HAM6 to connect ISCT6 table
16:46 (09:46) Kyle – Going to End-Y to scan RGA
16:50 (09:50) Chandra – Opened CB to shutdown HAM5/6 cleanroom. All cleanrooms ore off.
16:54 (09:54) Koji, Kiwamu, Stefan – Finished connecting ISCT6 table
17:00 (10:00) Kiwamu – Transitioning LVEA to Laser Hazard 
17:15 (10:15) Ed – Going to End-X to install cabling for wind sensor
17:26 (10:26) Kyle – Back from End-Y
17:46 (10:46) Apollo Mechanical on site to meet Bubba
17:47 (10:47) Filiberto – Finished with ISCT6 - Out of the LVEA 
17:50 (10:50) Vern – In the LVEA to turn on TCS Lasers
17:54 (10:54) Jason – Recovered Laser – Going into LVEA to check PSL UPS
18:15 (11:15) Vern – Power cycle PSL Rotation Stage EtherCAT chassis 
18:30 (11:30) Kiwamu & Koji – Alignment work on ISCT6
18:30 (11:30) Hugh – Going to HAM6 to unlock HEPI
18:47 (11:47) Ed – Back from End-X
19:05 (12:05) Hugh – Out of LVEA – HEPI is unlocked
19:30 (12:30) Koji & Kiwamu – Out of the LVEA
19:32 (12:32) Richard – Going to check TCS interlock
20:06 (13:06) TJ – Going into LVEA to recycle TCS laser interlock
20:35 (13:35) Vern & Richard – Going into LVEA to check TCS lasers
20:36 (13:36) Chandra & Calum – Going to Both end stations
20:37 (13:37) Kyle – Going to End-Y 
20:45 (13:45) Vern & Richard – Out of the LVEA
20:55 (13:55) Kiwamu & Koji – At ISCT6 for alignment work
21:17 (14:17) Cheryl – Going to ISCT6 
21:25 (14:25) Cheryl – Out of the LVEA
21:33 (14:33) Kiwamu & Koji – Finished with ISCT6 alignment
21:41 (14:41) Chandra & Calum – Back from end stations – Going into LVEA


Title: 08/11/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
Support:  
Incoming Operator: N/A

Shift Detail Summary: IFO is unlocked. PSL down. Jason working on bringing the lase back up. Cleanup and close out work has finished at HAM6. Vacuum crew has reopened GV5 & GV7. LVEA transitioned to Laser Hazard. Laser are back up. Commissioners recovering IFO.