Displaying report 1-1 of 1.
Reports until 09:19, Monday 21 May 2012
X1 DTS
david.barker@LIGO.ORG - posted 09:19, Monday 21 May 2012 (2905)
Summary of X1 install work in H2 EE building
Summary of install of the new DAQ Test Stand (DTS X1) May 14th - 18thth

Rolf, Dave, Richard, Jim.
--------------------

We have installed the following X1 systems in the H2 EE building:

Timing, including timing fanout and IRIG-B distribution. We are running the new Timing Master Fanout in the MSR with a GPS antenna connected directly to its F-type connector.

DC power (12V) for the IRIG-B and timing fanout.

Networking, including three switches: the general X1 network switch; the FE-DAQ network switch with 10GE link to data concentrator; the 10GE DAQ switch

The x1boot machine, which is also the code build machine. RCG branch2.5 was installed and the x1ioppsl0 model was built. All file systems for user apps, rtscore, rebuild etc. were constructed.

The NAT router connecting X1 with GC. We ran a GC line from the GC switch in the H2 racks. We installed a new Vyatta based NAT router, using the original GC address for the DTS (badger.ligo-wa.caltech.edu)

We installed one IO Chassis with an AC PS, we booted one front end, the x1psl0 system.
------------------------

Next item is to get the DAQ fully operational.
Displaying report 1-1 of 1.