Work Permit |
Date |
Description |
alog |
6092.html |
2016-08-16 17:41 |
Activity: Reprogram the CPS fanouts to shutoff the LED. Area of Activity: SEI CPS FanOut |
29125 |
6091.html |
2016-08-16 17:20 |
Activity: Upgrade tcioc to most recent version which supports TC3 (should be transparent for TC2) |
29131 |
6090.html |
2016-08-16 17:15 |
Activity: Install updated protection library (stat reset added, catch abort, improve lock loss stat and cleanup) Make sure all is svn checked Reboot machine to test clean boot |
|
6089.html |
2016-08-16 14:59 |
Activity: Pull signal cables from annulus ion pumps (IBM122, OBM136, IBM192 and OBM196) to the LY rack. Cables will be landed at both ends. Area of Activity: Vacuum, LY Rack, LVEA |
|
6088.html |
2016-08-16 12:58 |
Activity: Clean all condensate pans for the cooling coils. Vacuum all loose debris and scale and unplug the drains. Area of Activity: HVAC @ EX-EY-MX-MY and LVEA Supply Fans |
|
6087.html |
2016-08-15 21:06 |
Activity: Update GDS to version 2.17.4 for bugzilla 897, 936, and 952 for ramping excitations up and down. Area of Activity: GDS control room software |
29126 |
6086.html |
2016-08-15 19:52 |
Activity: Pull in a DB25 cable for the readbacks of the TCS RF Amp. Cable will be run from TCS-R1 to ISC-C3. FRS 6025. Area of Activity: H1 TCS LVEA |
29133 |
6085.html |
2016-08-15 19:29 |
Activity: Install a new copy of the daqd frame write software on h1fw0. This build of the frame writer includes some enhancements to help address stability. Issues and some expand diagnostic channels which may be put into the frame. |
|
6084.html |
2016-08-15 17:21 |
Activity: Install new ISS software to support testing of new outer loop chassis. Will require restart of all models to reallocate DAC chans. New binary IO card will be used. Fast chans added to commissioning frame. DAQ restart needed. Area of Activity: PSL front end software |
29139 |
6083.html |
2016-08-15 17:12 |
Activity: Swap the CO2 laser on the TCSy table for a spare; align the new laser to the original beam path. The TCSy CO2 laser had a power drop from ~55W to ~40W. The RF driver was swapped and now the laser is only outputting ~15W, therefore we are now swapping the laser to return to ~55W operation. The TCSy table will be opened and a 50W Class IV CO2 laser will be operating, therefore this will require the LVEA to be in LASER HAZARD. |
|
6082.html |
2016-08-15 15:59 |
Activity: Start and run locally mounted turbo backed by pump cart and scroll pump at Vertex RGA * Bake RGA while isolated from Vertex volume and with calibration gas isolation valves open. Area of Activity: Vacuum, Vertex RGA, LVEA |
|
6081.html |
2016-08-15 14:43 |
Activity: Install new ISS servo. As planned at the moment install the new servo in the PSL racks. Extend the Photo Diode cable from the Ham chamber to the Rack. Connect the new servo to IO system. Make software changes as needed test. Area of Activity: PSL ISS outer loop Servo |
|
6080.html |
2016-08-12 18:13 |
Activity: Isolate and remove locally mounted turbo pump from RGA pump port * Install 1 1/2" O-ring valve in place of removed turbo * Pump out volume between pump port valve and O-ring valve - Close O-ring valve * Open 2 1/2" RGA isolation valve and expose RGA to Y-end volume * Energize RGA filament and start continuous scanning * Stop scanning at the end of the day and de-energize filament * Leave RGA exposed to Y-end volume (new "nominal" state). Area of Activity: Vacuum, RGA, Y-end |
|
6079.html |
2016-08-12 17:33 |
Activity: During Tuesday maintenace I will restart both servers to access the BIOS and setup the correct parameters on the IPMI to prevent DHCP requests. |
|
6078.html |
2016-08-12 15:20 |
Activity: Using a tripod, mount the Pcal ITM camera and optical tube in front of the dedicated viewport and capture an image of the ITM. Note that the housing had interference issues with the bellows on the adapter and modifications are being designed. Lexan protector will stay in place until all adjustments have been made. It will only be removed for the final photos after the setup has been secured. Lexan protector will be replaced immediately after capturing the images and the cover on the viewport protector will be replaced. Area of Activity: "Pcal" ITM camera, Xarm manifold, LVEA |
|
6077.html |
2016-08-11 17:32 |
Activity: Remove the lexan plate out of each of three view ports on the north side of HAM6 for aligning the optics in ISCT6. The lexan plates will remain out permanently. Area of Activity: ISC, north side of HAM6 |
|
6076.html |
2016-08-11 16:59 |
Activity: The ultrasonic Gust meter will be placed in the desert next to the wind fence at end-X. Cables will be pulled through the underground conduit from the outside to the inside of the VEA area and will be terminated into the electronics rack. |
|
6075.html |
2016-08-11 16:57 |
Activity: Opening GV 5 & 7 after HAM 6 vent & pump down. Area of Activity: VE, LVEA, GV 5 & 7 OPENING |
|
6074.html |
2016-08-10 18:59 |
Activity: Swap PEM power supplies in CER for Kepco JQE. This is to make room for the ±24V power supplies that will be used to power Beckhoff/Baffle PD Amplifier/ Spool X/Y camera ect. Pem power distribution chassis and microphones to be powered down. |
29135 |
6073.html |
2016-08-10 18:11 |
Activity: Update and restart h0vaclx to change PT110 gauge pair to BPG 402 Inficon. DAQ restart required. |
|
6072.html |
2016-08-10 16:00 |
Activity: PNNL will be coordinating an OTDR test of the fiber pair that feeds the observatory's data connection to make sure that signal strength is appropriate for upgrading to 10Gb/s up from 1Gb/s. Wireless, phones, and internal wired networks at the observatory will be unaffected. Internet access will be interrupted during this work. Area of Activity: GC Internet connection |
|
6071.html |
2016-08-10 15:59 |
Activity: Pull new shielded network cables for the GigE cameras on ISCT1. Work will require climbing over HAM 1 & 2. Install new patch panel on ISCT1 for new POP GigE camera. Area of Activity: H1 Gig E Camera |
29123 |