Title: 08/17/2016, Evening Shift 23:00 – 07:00 (16:00 – 00:00) All times in UTC (PT) State of H1: PSL down due to water leak in the HPO Commissioning: Outgoing Operator: Corey Activity Log: All Times in UTC (PT) 23:00 (16:00) Start of shift 23:15 (16:15) Terra – Going into the LVEA 23:51 (16:51) Jason – Out of the LVEA 23:52 (16:52) Ben A. – Cable work around HAM2 23:56 (16:56) Terra – Out of the LVEA 23:58 (16:58) Jason – Going into the LVEA to turn out PSL lights and recover laptop 00:10 (17:10) Jason – Out of the LVEA 00:31 (17:31) Ben – Out of the LVEA Title: 08/17/2016, Evening Shift 23:00 – 07:00 (16:00 – 07:00) All times in UTC (PT) Support: Incoming Operator: N/A Shift Detail Summary: No commissioner work planned due to PSL problems. Ending shift early.