Reports until 18:03, Wednesday 17 August 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 18:03, Wednesday 17 August 2016 (29168)
Ops Shortened Evening Shift Summary
Title:  08/17/2016, Evening Shift 23:00 – 07:00 (16:00 – 00:00) All times in UTC (PT)
State of H1: PSL down due to water leak in the HPO   
Commissioning: 
Outgoing Operator:  Corey
 
Activity Log: All Times in UTC (PT)

23:00 (16:00) Start of shift
23:15 (16:15) Terra – Going into the LVEA 
23:51 (16:51) Jason – Out of the LVEA
23:52 (16:52) Ben A. – Cable work around HAM2
23:56 (16:56) Terra – Out of the LVEA
23:58 (16:58) Jason – Going into the LVEA to turn out PSL lights and recover laptop
00:10 (17:10) Jason – Out of the LVEA
00:31 (17:31) Ben – Out of the LVEA

Title: 08/17/2016, Evening Shift 23:00 – 07:00 (16:00 – 07:00) All times in UTC (PT)
Support:   
Incoming Operator: N/A

Shift Detail Summary:  No commissioner work planned due to PSL problems. Ending shift early.