Reports until 16:00, Thursday 18 August 2016
H1 General
edmond.merilh@LIGO.ORG - posted 16:00, Thursday 18 August 2016 (29181)
Shift Summary - Day
TITLE: 08/18 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Jeff
SHIFT SUMMARY:
LOG:
13:30 Bubba into LVEA checking eye-wash stations
14:00 Peter into PSL
15:34 Jeff into PSL
15:39 Take Cover Drill for 300-400 areas in effect
15:46 EX anemometer cabling
16:05 Corey into LVEA to take pictures of tables
16:06 Take Cover drill terminated
16:35 Fil removing PEM AA chassis to remedy a bad MIC (HAM7) channel.
16:40 Jim and TJ to EX for anemometers
16:43 Karen called; leaving MY
16:47 Corey out
16:50 Corey headed to the End stations to take pictures
17:11 Jim and TJ back. Kim heading back to EX to place a dust monitor
17:32 Karen to H2 building to vacuum
17:34 Richard informed me that I may see HAM7 (PT170) pressure loss. This is due to him breaking connections.
17:47 DAQ Restart
17:55 Kyle out to LVEA
18:07 Karen back and going into the mechanical room.
18:09 Kyle out
18:16 Tour is underway for the US SC on Reasearch and Tech. into LVEA.
18:27 Corey back
18:30 Jason and Alistair finished with TCS. Cleanup is still in order.
19:51 Fill pulling cables for ISS outer loop. Climbing over HAM1
20:16 Jason ans Al out o clean up around TCSY
20:26 John and Bubba goin into LVEA
20:44 Jason and Al completed TCSY work. Y is still keyed OFF. X is ON. Alistair has aLogged this.
21:02 Fil and Mark going to return the PEM AA chassis to the CER rack.
21:04 Jim and Ian to EX for gust meter
21:38 Peter headed out to PSL racks and then into the enclosure.
21:39 Richard to MY
21:47 Fil and Mark back
21:54 Evan G and Jeff K to CER to run TF on OMC AA WP#6099
21:56 Richard back from MY
21:58 Corey driving guest up to the "bridge" to take pictures
22:00 Jim and Ian back
22:05 Chandra to MY
22:32 Chandra back
22:42 Peter is out