Attached is a plot of the cooling water flow rate for the 4 laser heads after replacement of the burst hose (over head 3) and replacement of the head 4 flow sensor. Also attached is a 30-day trend plot of the same signals. The large jump in flow rates about 6 days into the plot coincides with replacement of the water manifold located under the table. At this stage it is too early to tell if replacing the head 4 flow sensor fixes the problem with the all over the place signal seen in the 30-day trend plot.