Title: 08/19/2016, Evening Shift 23:00 – 07:00 (16:00 – 00:00) All times in UTC (PT) State of H1: Relocking after PSL back in operation. Commissioning: Outgoing Operator: Ed Activity Log: All Times in UTC (PT) 23:00 (16:00) Start of shift 23:12 (16:12) Filiberto – Powered on ITM HV power supply 00:11 (17:11) Kyle – Into LVEA to adjust RGA in Vertex 00:19 (17:19) Kyle – Out of the LVEA 04:58 (21:58) Sheila & Terra – Going to IOTC1 to work on camera alignment 05:20 (22:20) Sheila & Terra – Out of the LVEA Title: 0819/2016, Evening Shift 23:00 – 07:00 (16:00 – 07:00) All times in UTC (PT) Support: Sheila, Terra, Evan Incoming Operator: N/A Shift Detail Summary: Commissioning work continuing.