Observatory Mode: taken from Commissioning to Corrective Maintenance (for PSL work) for most of the morning
Atlantic/Africa 7.1 earthquake last night around 10pm. It tripped Test Masses & TMSy.
Once the PSL was brought back (around noon), I performed an Initial Alignment (lost the MC for a bit during the PRM portion of procedure). After the Alignment was complete, H1 was handed over to the Commissioners & they've had a few 50W locks.
Jeff K damped down some rung up violin modes (most likely due to the earthquake).