-
SEI: --
-
SUS: Charge measurements? (Betsy)
-
CDS: --
-
PSL: Laser down due to cooling system; work in the PSL room
-
VAC: Vertex RGA baking (contine through the week); possible CP4 tests; VAC team possibly working with SUS wrt charge
-
Facilities: S&K Electric pipe work in Mechanical Room
General Announcement about testing of Remote Access Controls During DAY (8am-4pm, M-F) shift (Jonathan work permit 6121).
Went over the Work Permits.