Reports until 13:35, Tuesday 30 August 2016
LHO VE
chandra.romel@LIGO.ORG - posted 13:35, Tuesday 30 August 2016 (29387)
new vacuum gauge on BSC4
Gerardo, John, Chandra

Craned the small scissor lift next to BSC4. Installed wide range hot cathode/pirani gauge and second all-metal valve on bottom existing valve (below CC/pirani pair). Pumped down and valved into main volume. Needs cables.

Left scissor lift next to BSC4.