TITLE: 08/30 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: TJ
SHIFT SUMMARY: Down for maintenance, SRC Gouy phase measurements, and ISS work until ~21:00. Ran through initial alignment and the IFO locked up to DC Readout easily.
LOG:
15:03 Karen to LVEA
15:09 Bubba getting 3IFO crates down from LVEA racks for Betsy
15:11 Ed to EY OPLEV work
15:22 Peter to PSL racks looking at connectors
15:29 Peter out
15:29 Gerardo to LY vac rack
15:33 Richard to HAM2
15:45 Kiwamu to LVEA for Gouy phase measurements
15:52 FIle to EY WFS readbacks
15:56 Chandra to LVEA
16:00 RIchard to LVEA
16:15 Hugh restarting HEPI pump station
16:23 Norco to MX N2
16:54 Gerardo done
16:58 Chris to EX
16:58 Hugh to ends for HEPI checks
17:04 Richard to LX vac rack
17:06 Robert to LVEA setting up injection equipment
17:08 Karen to EY
17:09 Kiwamu out
17:21 RIchard out
17:34 John and Chandra to LVEA
17:46 Hugh done
17:51 Jeff B to LVEA
18:00 Gerardo to LVEA
18:01 Jeff B done
18:13 Karen out of EY
18:16 Corey to squeezer bay
18:37 John and Chandra done
18:37 Gerardo done
18:40 Jenne to LVEA regluing seismos
18:40 Kiwamu done with SRC meas.
18:40 Keita to swap ISS board
18:44 Corey out
18:55 Jenne done
19:02 Robert to LVEA
19:41 Keita done
20:22 Gerardo done
20:22 Chandra done
20:24 Kiwamu and Corey to LVEA taking pics
20:50 Kiwamu and Corey out
21:10 ETMx RMS WD tripped
22:34 Sheila to LVEA