Reports until 16:00, Tuesday 30 August 2016
H1 General
travis.sadecki@LIGO.ORG - posted 16:00, Tuesday 30 August 2016 (29390)
Ops Day Shift Summary

TITLE: 08/30 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: TJ
SHIFT SUMMARY:  Down for maintenance, SRC Gouy phase measurements, and ISS work until ~21:00.  Ran through initial alignment and the IFO locked up to DC Readout easily.
LOG:

15:03 Karen to LVEA

15:09 Bubba getting 3IFO crates down from LVEA racks for Betsy

15:11 Ed to EY OPLEV work

15:22 Peter to PSL racks looking at connectors

15:29 Peter out

15:29 Gerardo to LY vac rack

15:33 Richard to HAM2

15:45 Kiwamu to LVEA for Gouy phase measurements

15:52 FIle to EY WFS readbacks

15:56 Chandra to LVEA

16:00 RIchard to LVEA

16:15 Hugh restarting HEPI pump station

16:23 Norco to MX N2

16:54 Gerardo done

16:58 Chris to EX

16:58 Hugh to ends for HEPI checks

17:04 Richard to LX vac rack

17:06 Robert to LVEA setting up injection equipment

17:08 Karen to EY

17:09 Kiwamu out

17:21 RIchard out

17:34 John and Chandra to LVEA

17:46 Hugh done

17:51 Jeff B to LVEA

18:00 Gerardo to LVEA

18:01 Jeff B done

18:13 Karen out of EY

18:16 Corey to squeezer bay

18:37 John and Chandra done

18:37 Gerardo done

18:40 Jenne to LVEA regluing seismos

18:40 Kiwamu done with SRC meas.

18:40 Keita to swap ISS board

18:44 Corey out

18:55 Jenne done

19:02 Robert to LVEA

19:41 Keita done

20:22 Gerardo done

20:22 Chandra done

20:24 Kiwamu and Corey to LVEA taking pics

20:50 Kiwamu and Corey out

21:10 ETMx RMS WD tripped

22:34 Sheila to LVEA