TITLE: 08/31 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY: Commissoining and an earthquake.
LOG:
-
23:23 - PSL Dust monitor 2 in major alarm. A large spike in the relative humidity in the chiller room and the diode room also occured at that time, but after consulting with Jason and Peter, as well as checking the chiller room, it was thought to be okay. (screenshot attached)
-
03:34 - EQ 6.7 in Papua New Guinea.