Work Permit | Date | Description | alog |
6130.html | 2016-08-30 10:58 |
Activity: Crane the following: scissor lift next to BSC4 (northwest corner) and turbo pump cart. Install new hot ion gauge assembly on existing valve near top of BSC4. Need to pump down small air volume using a pump cart. Area of Activity: VE, BSC4, install hot ion gauge |
29387 |
6129.html | 2016-08-29 15:37 | Activity: Replace, repair, and/or reconfigure semi-permanent cleanroom curtains in LVEA and both end stations. | |
6128.html | 2016-08-29 13:45 | Activity: Move the clean room that is currently located on south side of output arm a few feet away from the tube to allow for curtain repair and then return the clean room to the original location. | |
6127.html | 2016-08-29 12:50 | Activity: Install and configure a new DMT to EPICS bridge so that we will continue to reflect the DMT signals (range) into EPICS in near realtime after the AUTH/LIAM project updates the authentication server infrastructure. | |
6126.html | 2016-08-29 11:43 | Activity: Activity: Connect output of Inficon guage (HAM6) to a safety interlock in the CER Mezzanine. Interlock enables/disables the high voltage power supplies to the Fast Shutter and PZTs. This will involve shutting down the associated HV supplies. Will coordinate with vacuum team when connecting/disconnecting to vacuum gauge. A safety interface relay chassis D1400047 will be installed on top of rack in CER. | |
6125.html | 2016-08-29 11:40 | Activity: Reconfigure h1fw1 to match h1fw0. * new executable (daqd build on h1fw0) * new configuration Configure h1fw2 to run the old build (currently on h1fw1) for now. | |
6124.html | 2016-08-29 10:52 |
Activity: Re-epoxy 2 seismometers to the floor near where the HAM6 doors are stored during a vent. They were removed during the HAM6 vent, and need to be re-installed. Area of Activity: NN array, LVEA floor |
29385 |
6123.html | 2016-08-29 08:50 |
Activity: ETMy oplev maintenance. Power cycle ETMy oplev AA chassis. This is to hopefully solve the issue where the oplev is reporting the optic moving by > +-0.5 urad while locked, which shouldn't be possible. Tweak ETMy oplev laser power to address laser glitching. No view ports will be exposed during this work. Area of Activity: ETMy Optical Lever |
29386 |
6122.html | 2016-08-26 10:26 | Activity: Fix some errors in h1psliss model and restart. Some testpoint names are changed so this needs a DAQ restart. | |
6121.html | 2016-08-25 16:16 |
Activity: Turn on remote access controls during business hours. This will limit remote ssh access to CDS to users who have approved work permits and have been granted access by the operator. The purpose of this to test the remote access control system, by allowing operators to administer the system and to condition the remote users to acquiring a work permit and coordinating with the operator prior to remotely accessing CDS. At this time it is proposed that this system only be enabled 8am - 4pm Monday-Friday while there is typically operator coverage. During O2 this could be enabled 24x7. As users will be locked out of CDS until coordinating with the operator, it is expected that there will be increased support requests until users and operators get used to the workflow. Documents: T1500529 |
|
6120.html | 2016-08-24 13:56 | Activity: Add dolphin network card to PSL Add 3rd loop ISS Model changes to ISS and LSC | |
Older Permits | |||
6089 | 22:36, 30 August 2016 | Annulus Ion Pump Cables Pulled and Landed | 29405 |
6119 | 09:30, 30 August 2016 | GC core router will be removed and replaced | 29382 |
5986 | 09:56, 30 August 2016 | HEPI Pump Station #1 back in service | 29384 |