TITLE: 08/31 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: TJ
SHIFT SUMMARY: First half of today was dedicated to Kiwamu's SRC Gouy phase measurements. After lunch, I did an IA, and after some troubleshooting with Sheila and Jenne of ALS Diff, we are back to locking.
LOG:
16:20 Kissel taking TMSx TFs, Kiwamu starting SRC measurements
16:24 Keita to LVEA making ISS 2nd loop electronics measurements
16:39 Kiwamu to LVEA byu ISCT6 for SRC Gouy meas.
16:44 Karen done at MY
16:48 Cristina done at MX
17:05 Betsy, John, and Chandra to MY
17:35 Betsy, John, and Chandra to MX
18:03 Kissel done with TMSx
19:31 Kiwamu done
19:34 Keita to LVEA for more 2nd loop meas.
20:29 Chandra to LVEA
20:43 Chandra done
21:21 Gerardo to MY
22:22 Gerardo done
22:56 Jim switching ISIs to Earthquake mode for incoming EQ