thomas.shaffer@LIGO.ORG - posted 00:02, Thursday 01 September 2016 (29429)
Ops Eve Shift Summary
TITLE: 09/01 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC STATE of H1: Lock Aquisition INCOMING OPERATOR: Sep SHIFT SUMMARY: Lots of commissioning, a PSL trip, and a small earthquake. LOG:
01:59 PSL went out, Chiller error, flow sensor 1. Peter was awesome and drove out to the site to get it back on and going for more commissioning.