Had to trend and move back PR2 alignment sliders to be able to find IR. After that I had trouble locking DRMI and PRMI so I ran through an initial alignment. No trouble after that. Kiwamu ran his Gouy phase measurements in the morning during which time there was a 7.1 mag. earthquake off the coast of New Zealand. The PSL also tripped during his measurements and Peter brought it back. I updated h0vaclx and h0vacly to add beam tube annulus ion pumps. John W. turned up the air conditioning in the control room. Kyle has been periodically turning down the heating on the HAM4 RGA bakeout. Terra has been taking PI measurements. Jenne and Terra are now recovering the IFO from a lock loss. 15:48 UTC Karen opening OSB receiving door 15:54 UTC Chandra to HAM4 to check on RGA bakeout 15:59 UTC Kyle to HAM4 RGA to turn down heating 16:02 UTC Chandra back 16:06 UTC Kiwamu starting Gouy phase measurement. Setting IFO to down. 16:09 UTC Kyle back 16:22 UTC Filiberto to end Y to check on Beckhoff end station 3 chassis 16:42 UTC PSL tripped off, Peter investigating 16:53 UTC Travis, Betsy, Mitchell to LVEA for 3rd IFO inventory 17:15 UTC Richard checking on LVEA access door 17:19 UTC Richard done 17:21 UTC Kiwamu to ISCT6 17:54 UTC Kyle to HAM4 RGA to turn down heating 17:58 UTC Kiwamu back 17:58 UTC Kyle back 18:07 UTC Gerardo to LVEA to check on new beam tube annulus ion pumps 18:34 UTC Travis, Betsy, Mitchell out 19:07 UTC Filiberto heading back 19:21 UTC Kiwamu to ISCT6 to dismantle setup used for Gouy phase measurement 19:29 UTC Kiwamu back, done with Gouy phase measurement 19:37 UTC DAQ restart to add vacuum channels for beam tube annulus ion pumps 19:37 UTC Karen to OSB optics lab to clean 19:44 UTC Filiberto turned back on ITM HV (tripped off from vacuum code restart) 20:09 UTC Karen out of optics lab 20:14 UTC Betsy to LVEA west bay to check serial numbers on parts 20:19 UTC Chandra to mid Y 20:22 UTC Kyle to HAM4 RGA to turn down heating 20:23 UTC Travis to LVEA west bay to help Betsy 20:31 UTC Gerardo to LVEA to check signals of beam tube annulus ion pumps 20:33 UTC Kyle done 20:40 UTC Started initial alignment 21:26 UTC Completed initial alignment 21:34 UTC Travis and Betsy done 22:24 UTC Kyle to mid Y 22:25 UTC Jenne and Sheila to ISCT1 22:44 UTC Jenne and Sheila back