No overfill required today as we had an LN2 delivery and I had to reduce the LLCV %open from 21% to 18%. ~1635 - 1700 hrs. local -> I visually confirmed that CP3's exhaust line was frosted - dewar vapor pressure at 20 psi. Next overfill to be Friday, Sept. 9th.