In general; Varying levels of higher-than-normal humidity levels in the LASER room and the Osc box and the corresponding temp fluctuations in the xtals are all related to the ongoing chiller issues. The resulting tripping/shutdowns are also evident in these trends as well. The ongoing DB3 issue is addressed here.