Reports until 13:01, Thursday 08 September 2016
LHO VE
kyle.ryan@LIGO.ORG - posted 13:01, Thursday 08 September 2016 (29547)
Opened CP3's exhaust check valve bypass valve - > Leaving open until further notice
This was done at John's suggestion so as to reduce the risk of over pressurization of the LN2 inner vessel during dewar deliveries (Due to obstructed sensing line, the LN2 level for CP3 is determined by a manual setting of the fill valve which maintains the level adequately only for static conditions and must be adjusted as a function of dewar liquid height and vapor pressure)