patrick.thomas@LIGO.ORG - posted 00:26, Saturday 10 September 2016 - last comment - 00:41, Saturday 10 September 2016(29587)
Ops Evening Summary
Matt, Stefan, Terra and Jamie commissioning

Almost 7 hour lock broke around 05:27 UTC in NOISE_TUNINGS. Matt, Stefan and I have not been able to get through ENGAGE_DRMI_ASC since. We are calling it a night.

23:44 UTC Chris driving ITMX at 18Hz
00:13 UTC Chris driving ITMX at 28Hz
Comments related to this report
matthew.evans@LIGO.ORG - 00:41, Saturday 10 September 2016 (29590)

This long lock was mostly at 40W, with about 30 minutes at 50W at the end.  50W was stable, so we tried for low-noise, but broke the lock along the way.