Reports until 09:51, Monday 12 September 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 09:51, Monday 12 September 2016 (29617)
08:30 Meeting Minutes
SEI: Had trouble restoring CS HEPI after power outage. Hugh is investigating cause.

SUS: No report.

CDS: Recovery from power outage appears OK. Filiberto will be working on the ISS Second Loop chassis.
 
PSL: No chiller trips since swapping in the backup chiller. Old chiller is being moved into the mechanical building for testing and repair.
During the power outage the PMC Refl power meter was damage. A replacement is being looked into.

VAC: All appears OK after the power outage. Gerardo is looking into a problem with the Mid-X gauge for IP-10.

FAC: Restarted various systems after the power outage.

Reviewed Tuesdays pending work permits.   