Title: 09/12/2016, Day Shift 15:00 – 23:00 (08:00 –16:00) All times in UTC (PT) State of H1: IFO is unlocked. Working on recovery after power outage. Commissioning: Daniel and Keita working ISS Second Loop Outgoing Operator: N/A Activity Log: All Times in UTC (PT) 15:00 (08:00) Start of shift 15:27 (08:27) Filiberto – LVEA PSL rack and HAM2 installing ISS Second Loop chassis 15:51 (08:51) Karen – Going into the LVEA to do a walk through 15:51 (08:51) Christina – Going to Mid-X for cleaning 15:56 (08:56) Filiberto – Finished in LVEA 15:57 (08:57) Jason – Going into the LVEA to reset the Noise Eater 16:36 (09:37) Filiberto – Going into LVEA to work on ISS Second Loop chassis 16:49 (09:49) Filiberto – Out of the LVEA 17:00 (10:00) Jeff B. – Going to both End Stations to check dust monitors 17:08 (10:08) Filiberto – Going into the LVEA to reinstall ISS Second Loop chassis 17:29 (10:29) Filiberto – Out of LVEA 18:00 (11:00 ) Jeff B. – Back from End Stations 18:08 (11:08) TJ – Resetting Guardian nodes to correct problem apparently from power outage 20:44 (13:44) Filiberto – Going into LVEA to swap the ISS Second Loop chassis 21:05 (14:05) Filiberto – Out of LVEA Title: 09/12/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT) Support: Sheila, Jenne, Dave, Richard, Carlos, TJ Incoming Operator: N/A Shift Detail Summary: Large dust storm in the area. Sorting out various problems after the power outage. Ran through an initial alignment. Commissioners working or relocking after the power outage.