jeffrey.bartlett@LIGO.ORG - posted 16:07, Monday 12 September 2016 (29634)
Ops Day Shift Summary

Title:  09/12/2016, Day Shift 15:00 – 23:00 (08:00 –16:00) All times in UTC (PT)
State of H1: IFO is unlocked. Working on recovery after power outage.  
Commissioning: Daniel and Keita working ISS Second Loop
Outgoing Operator:  N/A
 
Activity Log: All Times in UTC (PT)

15:00 (08:00) Start of shift
15:27 (08:27) Filiberto – LVEA PSL rack and HAM2 installing ISS Second Loop chassis
15:51 (08:51) Karen – Going into the LVEA to do a walk through 
15:51 (08:51) Christina – Going to Mid-X for cleaning
15:56 (08:56) Filiberto – Finished in LVEA 
15:57 (08:57) Jason – Going into the LVEA to reset the Noise Eater
16:36 (09:37) Filiberto – Going into LVEA to work on ISS Second Loop chassis
16:49 (09:49) Filiberto – Out of the LVEA
17:00 (10:00) Jeff B. – Going to both End Stations to check dust monitors 
17:08 (10:08) Filiberto – Going into the LVEA to reinstall ISS Second Loop chassis
17:29 (10:29) Filiberto – Out of LVEA
18:00 (11:00 ) Jeff B. – Back from End Stations 
18:08 (11:08) TJ – Resetting Guardian nodes to correct problem apparently from power outage
20:44 (13:44) Filiberto – Going into LVEA to swap the ISS Second Loop chassis
21:05 (14:05) Filiberto – Out of LVEA


Title: 09/12/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
Support: Sheila, Jenne, Dave, Richard, Carlos, TJ   
Incoming Operator: N/A

Shift Detail Summary:  Large dust storm in the area. Sorting out various problems after the power outage. Ran through an initial alignment. Commissioners working or relocking after the power outage.  