Daniel, Dave:
new h1psliss code was installed and the DAQ was restarted. Main DAQ change was the addition of 9 fast channels at 2048Hz to the commissioning frame:
H1:PSL-ISS_OUTERLOOP_PDSUMINNER_OUT_DQ
H1:PSL-ISS_OUTERLOOP_PDSUMOUTER_OUT_DQ
H1:PSL-ISS_OUTERLOOP_PD_CAL_OUT_DQ
H1:PSL-ISS_OUTERLOOP_RIN_AC_COUPLING_OUT_DQ
H1:PSL-ISS_OUTERLOOP_RIN_CTRL_OUT_DQ
H1:PSL-ISS_OUTERLOOP_RIN_ERR1_OUT_DQ
H1:PSL-ISS_OUTERLOOP_RIN_ERR2_OUT_DQ
H1:PSL-ISS_OUTERLOOP_RIN_INNER_OUT_DQ
H1:PSL-ISS_OUTERLOOP_RIN_OUTER_OUT_DQ