Title: 09/13/2016, Day Shift 15:00 – 23:00 (08:00 –16:00) All times in UTC (PT) State of H1: IFO is unlocked. Scheduled maintenance day. Commissioning: Daniel & Keita commissioning the ISS Second Loop Outgoing Operator: N/A Activity Log: All Times in UTC (PT) 14:45 (07:45) Chris – Going to both end stations VEAs 15:00 (08:00) Christina & Karen – Cleaning in the LVEA 15:00 (08:00) Jeff B. & Peter – Forklift old chiller to Mechanical Building (WP #6147) 15:07 (08;07) Chris – Back from End Stations 15:20 (08:20) Jeff & Peter – Finished with chiller move 15:25 (08:25) Alfredo & Elizabeth – Going into Biergarten to make measurements 15:38 (08:38) Alfredo & Elizabeth – Out of LVEA 15:41 (08:41) Filiberto – Going into LVEA to swap ISS Second Loop chassis 15:42 (08:42) Cintas on site to swap mats 15:45 (08:45) Ed – Transitioned LVEA to laser safe (WP #6156) 15:52 (08:52) TJ – Guardian BCS work (WP #6152) 15:55 (08:55) Hugh & Jim – LVEA ITMX HEPI work (WP #6140) 15:56 (08:56) Alfredo – Going into LVEA to look for boards 16:00 (09:00) Filiberto & Marc – Going into CER 16:00 (09:00) Mike L. – Safety audit inspection tour (WP #6150) 16:11 (09:11) Alfredo – Out of the LVEA 16:12 (09:12) Jason – Going into the PSL to reset Power Meter & Check DBB PD 16:15 (09:15) Travis – Going to both End Stations to reset P-Cal camera 16:23 (09:23) Christina – Out of LVEA – Going to End-X to clean 16:43 (09:43) Kyle – Going to End-X for RGA work (WP #6157) 16:44 (09:44) Karen – Finished in the LVEA – Going to End-Y 16:55 (09:55) Filiberto & Marc – Out of CER 17:10 (10:10) Filiberto – Going to Mid-Y to recover cards 17:13 (10:13) Richard, Ed, - Working on BS Binary IO problem 17:15 (10:15) Elizabeth & Alfredo – Out of the LVEA 17:19 (10:19) Jenne – Taking a guest on LVEA tour and to the roof observation platform 17:23 (10:23) Karen – Finished at End-Y 17:30 (10:30) Dave – DAQ restart 17:35 (10:35) Norlco – Delivery of Nitrogen to End-X 17:37 (10:37) Christina – Finished at End-X 17:39 (10:39) Mike L. – Safety Audit finished in LVEA – Going to End-Y 17:40 (10:40) Jason – Out of the PSL 17:47 (10:47) Filiberto – Back from Mid-Y 17:48 (10:48) Filiberto – Pulling cable around HAM4 17:50 (10:50) Hugh – Finished in LVEA 17:53 (10:53) Hugh – Going to End Stations to check HEPI pump stations 18:14 (11:14) Karen – Going to Mid-Y 18:16 (11:16) Jenne – Finished with tour – Out of the LVEA 18:22 (11:22) Karen – Finished at Mid-Y 18:22 (11:22) Christina – Forklifting pallet into the OSB Receiving 18:25 (11:25) Travis – Finished with P-Cal cameras 18:31 (11:31) Filiberto – Finished in the LVEA 18:41 (11:41) Patrick – Updating user accounts on h1brsex & h1brsey (WP #6154) 18:57 (11:57) Hugh – Back from End Stations 19:52 (12:52) Dave – DAQ restart 20:00 (13:00) Kyle – Leaving End-X 20:10 (13:10) Dave & Nutsinee – TCS Chiller card upgrade 20:50 (13:50) Nutsinee – Going to restart TCS Chillers – Then to LVEA to check TCS 21:00 (14:00) Nutsinee – Out of the LVEA 22:21 (15:21) Ed – Going into CER to check HV power Fast Shutter supply Title: 09/12/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT) Support: Jenne, Dave Incoming Operator: Corey Shift Detail Summary: Working on relocking after maintenance window.