Reports until 16:03, Tuesday 13 September 2016
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:03, Tuesday 13 September 2016 (29672)
Ops Day Shift Summary
Title:  09/13/2016, Day Shift 15:00 – 23:00 (08:00 –16:00) All times in UTC (PT)
State of H1: IFO is unlocked. Scheduled maintenance day.  
Commissioning: Daniel & Keita commissioning the ISS Second Loop
Outgoing Operator:  N/A
 
Activity Log: All Times in UTC (PT)

14:45 (07:45) Chris – Going to both end stations VEAs
15:00 (08:00) Christina & Karen – Cleaning in the LVEA
15:00 (08:00) Jeff B. & Peter – Forklift old chiller to Mechanical Building (WP #6147)
15:07 (08;07) Chris – Back from End Stations
15:20 (08:20) Jeff & Peter – Finished with chiller move
15:25 (08:25) Alfredo & Elizabeth – Going into Biergarten to make measurements
15:38 (08:38) Alfredo & Elizabeth – Out of LVEA
15:41 (08:41) Filiberto – Going into LVEA to swap ISS Second Loop chassis
15:42 (08:42) Cintas on site to swap mats
15:45 (08:45) Ed – Transitioned LVEA to laser safe (WP #6156)
15:52 (08:52) TJ – Guardian BCS work (WP #6152)
15:55 (08:55) Hugh & Jim – LVEA ITMX HEPI work (WP #6140)
15:56 (08:56) Alfredo – Going into LVEA to look for boards
16:00 (09:00) Filiberto & Marc – Going into CER
16:00 (09:00) Mike L. – Safety audit inspection tour (WP #6150)
16:11 (09:11) Alfredo – Out of the LVEA
16:12 (09:12) Jason – Going into the PSL to reset Power Meter & Check DBB PD
16:15 (09:15) Travis – Going to both End Stations to reset P-Cal camera
16:23 (09:23) Christina – Out of LVEA – Going to End-X to clean
16:43 (09:43) Kyle – Going to End-X for RGA work (WP #6157)
16:44 (09:44) Karen – Finished in the LVEA – Going to End-Y
16:55 (09:55) Filiberto & Marc – Out of CER
17:10 (10:10) Filiberto – Going to Mid-Y to recover cards
17:13 (10:13) Richard, Ed, - Working on BS Binary IO problem
17:15 (10:15) Elizabeth & Alfredo – Out of the LVEA
17:19 (10:19) Jenne – Taking a guest on LVEA tour and to the roof observation platform
17:23 (10:23) Karen – Finished at End-Y
17:30 (10:30) Dave – DAQ restart
17:35 (10:35) Norlco – Delivery of Nitrogen to End-X
17:37 (10:37) Christina – Finished at End-X
17:39 (10:39) Mike L. – Safety Audit finished in LVEA – Going to End-Y
17:40 (10:40) Jason – Out of the PSL
17:47 (10:47) Filiberto – Back from Mid-Y
17:48 (10:48) Filiberto – Pulling cable around HAM4
17:50 (10:50) Hugh – Finished in LVEA
17:53 (10:53) Hugh – Going to End Stations to check HEPI pump stations
18:14 (11:14) Karen – Going to Mid-Y
18:16 (11:16) Jenne – Finished with tour – Out of the LVEA
18:22 (11:22) Karen – Finished at Mid-Y
18:22 (11:22) Christina – Forklifting pallet into the OSB Receiving 
18:25 (11:25) Travis – Finished with P-Cal cameras
18:31 (11:31) Filiberto – Finished in the LVEA
18:41 (11:41) Patrick – Updating user accounts on h1brsex & h1brsey (WP #6154)
18:57 (11:57) Hugh – Back from End Stations
19:52 (12:52) Dave – DAQ restart
20:00 (13:00) Kyle – Leaving End-X
20:10 (13:10) Dave & Nutsinee – TCS Chiller card upgrade
20:50 (13:50) Nutsinee – Going to restart TCS Chillers – Then to LVEA to check TCS
21:00 (14:00) Nutsinee – Out of the LVEA
22:21 (15:21) Ed – Going into CER to check HV power Fast Shutter supply
 

Title: 09/12/2016, Day Shift 15:00 – 23:00 (08:00 – 16:00) All times in UTC (PT)
Support:  Jenne, Dave   
Incoming Operator: Corey

Shift Detail Summary:  Working on relocking after maintenance window.