Displaying report 1-1 of 1.
Reports until 08:16, Wednesday 14 September 2016
H1 General
vernon.sandberg@LIGO.ORG - posted 08:16, Wednesday 14 September 2016 (29691)
Work Permit Summary for 2016 September 13
Work Permit Date Description alog
6157.html 2016-09-13 09:28 Activity: Re-flange RGA using proper vacuum fasteners, i.e. remove and replace factory supplied fasteners, on RGA (if still present) - will require venting the RGA volume while isolated from the X-end via one closed 2 1/2" metal valve*remove redundant O-ring valve which is in-series with the 1 1/2" metal pump port valve and install a turbo pump in its place*Pump RGA volume with leak detector and helium leak check RGA and turbo fittings*Wrap RGA components with aluminum foil and heat tapes so as to be prepared to Bake out RGA (to be done later under separate WP)*Shut down pumps after leak testing is complete 29665
6156.html 2016-09-13 08:42 Activity: Facilitate Safety tour and Tuesday maintenance Lasers on Tables and Ports closed.  
6155.html 2016-09-13 07:42 Activity: New outer loop model w/ sum, norm and RIN modules 29654
6154.html 2016-09-12 14:49 Activity: Update user accounts on h1brsex and h1brsey to match each other. 29663
6153.html 2016-09-12 14:42 Activity: Update h0vaclx to add X1 PT140 BPG402 gauge. Requires DAQ restart. 29657
6152.html 2016-09-12 14:22 Activity: Add Stage 2 SEI Configuration nodes for all of the BSCs. Stage 1 nodes already exist. I will create one node to start and cycle through the states to make sure that all is well before creating the others. 29655
6151.html 2016-09-12 11:54 Activity: GC core router will be rebooted and have transceivers swapped to upgrade from 1Gb to 10Gb connection with ESnet. Wireless and Internet connectivity will be disrupted during the short outage. CDS and LDAS internal networks will be unaffected, along with the phone system.  
6150.html 2016-09-12 08:25 Activity: Safety Audit Committee to tour the LVEA and End Stations.  
6149.html 2016-09-09 13:43 Activity: model update (mode RMS monitor point, add offset to PLL output gain adjustment) will require DAQ restart 29629
6148.html 2016-09-09 13:32 Activity: Create an HWS SDF to report any setting errors with any of the hws epics systems (h1hws[ex,ey,msr]). Will require DAQ restart to trend the SDF statistics. A cleanup of the hws autoburt.req files is also needed.  
6147.html 2016-09-09 13:20 Activity: Forklift backup PSL chiller (Wallace) from OSB Receiving to Mechanical Building for testing. 29566
6146.html 2016-09-09 10:31 Activity: Update the front-end model for the outer loop ISS, fix inverted BIO, add filters for PD diodes to account for whitening 29570
6145.html 2016-09-08 16:06 Activity: Move backup chiller from Mechanical Building to Chiller room. Will go through the LVEA.  
6144.html 2016-09-08 15:50 Activity: Drive down to EX and come back while seismic level is high and IFO locking is difficult. No entry to the building. This is for KAGRA guests.  
6143.html 2016-09-08 10:36 Activity: Give two KAGRA scientists a quick LVEA tour while initial alignment is done.  
6142.html 2016-09-08 08:28 Activity: Reinstall ISS Servo chassis in PSL-R1. Cabling for Photodiodes 5-8 at HAM2 will also be reconnected to new chassis. 29570
6141.html 2016-09-07 10:54 Activity: Power down h1fw0 and h1fw1 to document BIOS settings. Shutdowns will be staggered to prevent data loss.  
6140.html 2016-09-07 09:31 Activity: Offload ITMY HEPI Position Bias to Load Springs: DeIsolate HEPI, Adjust DSCW Springs to bring free position to servo'd spot. Reisolate platform. 29671
Displaying report 1-1 of 1.