The subsystems all reported no problems or issues after yesterday’s maintenance window. CDS continues working on the card reader access installation. Commissioners are working on the ISS Second Loop upgrade. CDS will assist as needed. Peter King reported a small leak (perhaps <1 drop per day) in the manifold. The PSL team is working on an upgrade of the manifold to eliminate these leaks. Kyle needs time at End-X to bake out the new RGA. Ops will notify Kyle when conditions allow End Station access. FMC installed an upgrade to the HVAC damper controls. Bubba reports a noticeable improvement in system function. There will be an all hands safety meeting at 15:00 in the LSB Auditorium. At the meeting Chandra will give an overview of View Ports.